Upcoming MyEd & BCeSIS Outages in March

The Ministry is doing another set of converions in March. This is just a heads up for those outage dates so that you can plan around it.  Sorry we have no control over them they are set by the Ministry.

Environments Dates Details
MyEducation BC Production and SDTest Mar 12 -13 MyEducation BC SDTest will be taken offline at 5 pm on Mar 12 to be refreshed with pre-Conversion Production data. SDTest will be back online as of 12 pm noon PT on Mar 13.
Mar 13 Cohort 5 conversion beginsMyEducation BC Production will be taken offline at 5 pm PT.
Mar 13 – 19 Conversion of Wave 1 Cohort 5 schools is in progress. MyEducation BC Production environment is unavailable.
Mar 19 Cohort 5 conversion is completeMyEducation BC Production is  back online as of 7 am PT.
Environment Dates Details
BCeSIS Production
and SDTest
Mar 7 – 8 BCeSIS SDTest will be taken offline to be refreshed so that it will be available while BCeSIS Production is offline.
Mar 13 MyEducation BC Conversion beginsBCeSIS Production will be taken offline at 5 pm PT.
Mar 13 – 17 Conversion of Wave 1 Cohort 5 schools is in progress. BCeSIS Production environment is unavailable.
Mar 17 MyEducation BC conversion continuesBCeSIS Production is back online as of 7 am PT.

 

Tags:

This entry was posted by andrew on Monday, February 23rd, 2015 at 6:38 am and is filed under BCeSIS, MyEducationBC. You can follow any responses to this entry through the RSS 2.0 feed. Both comments and pings are currently closed.